
{"id":233673,"date":"2026-09-29T17:30:00","date_gmt":"2026-09-29T17:30:00","guid":{"rendered":"https:\/\/mycryptomania.com\/?p=233673"},"modified":"2026-09-29T17:30:00","modified_gmt":"2026-09-29T17:30:00","slug":"soluna-and-bitdeer-add-7-mw-to-texas-bitcoin-mining-deal","status":"publish","type":"post","link":"https:\/\/mycryptomania.com\/?p=233673","title":{"rendered":"Soluna And Bitdeer Add 7 MW To Texas Bitcoin Mining Deal"},"content":{"rendered":"<h2>TL;DR<\/h2>\n<p>Soluna and Bitdeer have expanded their Project Kati 1 agreement by approximately 7 MW.<br \/>\nBitdeer\u2019s total deployment at the wind-powered Texas site will rise to 35 MW and about 2.42 EH\/s.<br \/>\nThe additional capacity is expected to be deployed by November and fully books the K1BC phase of the project.<\/p>\n<p>Soluna and Bitdeer are expanding a <a href=\"https:\/\/www.newsbtc.com\/news\/primexbt-insights-bitcoin-rallied-through-a-rate-hike-can-it-rally-through-a-bond-selloff\/\">Bitcoin<\/a> mining partnership before the original deployment has even finished.<\/p>\n<p>Soluna announced on September 28 that Bitdeer will add approximately 7 MW of mining equipment at Project Kati 1 in South Texas.<\/p>\n<p>The amendment increases Bitdeer\u2019s total planned deployment at the site to 35 MW.<\/p>\n<h2>Bitdeer Will Bring The Hardware<\/h2>\n<p>Under the agreement, Bitdeer supplies and owns the mining equipment.<\/p>\n<p>Soluna provides the data-center site, power and operating infrastructure.<\/p>\n<p>The two companies then share the mining proceeds generated by the deployment.<\/p>\n<p>The additional 7 MW is expected to raise Bitdeer\u2019s total hash rate at Kati 1 to approximately 2.42 EH\/s.<\/p>\n<p>Bitdeer is using Sealminer A2 Pro Air machines for the project.<\/p>\n<p>Soluna expects the expansion to be completed in November.<\/p>\n<p>The deal also fully subscribes the K1BC phase of Project Kati 1, meaning the capacity allocated to that section of the site has now been spoken for.<\/p>\n<h2>Mining Infrastructure Is Becoming More Flexible<\/h2>\n<p>The arrangement is slightly different from a traditional hosting deal.<\/p>\n<p>A conventional mining host is generally paid for providing power and rack space.<\/p>\n<p>Soluna\u2019s co-mining structure gives it exposure to the Bitcoin produced by the machines rather than relying solely on fixed hosting revenue.<\/p>\n<p>For Bitdeer, the model provides access to power and infrastructure without requiring it to build another site from scratch.<\/p>\n<p>Project Kati 1 is an 83 MW facility connected with wind generation in Willacy County, Texas.<\/p>\n<p>Soluna\u2019s broader business model focuses on locating energy-intensive computing near renewable generation that would otherwise be curtailed or underused.<\/p>\n<p>Bitcoin mining has historically been the main workload for that model, although the company has increasingly positioned its sites for other forms of high-performance computing as well.<\/p>\n<p>The timing of the expansion is notable.<\/p>\n<p>Soluna and Bitdeer announced their original 28 MW agreement only in August.<\/p>\n<p>Adding another 7 MW roughly a month later takes the deployment to 35 MW before the first agreement has fully ramped.<\/p>\n<p>That is a relatively straightforward vote of confidence in the site.<\/p>\n<p>Bitcoin mining economics can change quickly with price, network difficulty and power costs.<\/p>\n<p>For now, Bitdeer is responding by adding more machines.<\/p>\n<p><em>This article was written by the News Desk and edited by <a href=\"https:\/\/www.newsbtc.com\/author\/rae-samuel\/\">Samuel Rae<\/a>.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>TL;DR Soluna and Bitdeer have expanded their Project Kati 1 agreement by approximately 7 MW. Bitdeer\u2019s total deployment at the wind-powered Texas site will rise to 35 MW and about 2.42 EH\/s. The additional capacity is expected to be deployed by November and fully books the K1BC phase of the project. Soluna and Bitdeer are [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":233674,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-233673","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-discovery"],"_links":{"self":[{"href":"https:\/\/mycryptomania.com\/index.php?rest_route=\/wp\/v2\/posts\/233673"}],"collection":[{"href":"https:\/\/mycryptomania.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mycryptomania.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/mycryptomania.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=233673"}],"version-history":[{"count":0,"href":"https:\/\/mycryptomania.com\/index.php?rest_route=\/wp\/v2\/posts\/233673\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mycryptomania.com\/index.php?rest_route=\/wp\/v2\/media\/233674"}],"wp:attachment":[{"href":"https:\/\/mycryptomania.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=233673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mycryptomania.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=233673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mycryptomania.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=233673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}